Category
Motorsport Kart Parts Lap Time
Store
Demon Tweeks
Brand
Alfano
A range of NTC type water or oil temperature sensors suitable for use with Alfano 6 1T, Alfano 6 2T, Pro Evo III and ADM lap timers. Ideal for karts with water cooled engines.Max temperature - 180 degrees C (356 degrees F)Optional extension lead available separately.
73.2 GBP
Recommendations
Choose your language and region
Klarna is available around the world with a variable offering, choose one that suits you best.
Copyright © 2005-2024 Klarna Bank AB (publ). Headquarters: Stockholm, Sweden. All rights reserved. Klarna Bank AB (publ). Sveavägen 46, 111 34 Stockholm. Organization number: 556737-0431