Category
Engineering: general
Store
Wordery
Brand
Grin verlag
Numerical Flow Simulation in FDA's "Critical Path" benchmark blood pump : Grin Verlag : 9783346238078 : 3346238075 : 16 Feb 2021 : Master's Thesis from the year 2019 in the subject Engineering - Mechanical Engineering, grade: 1.3, University of Rostock, course: Computational Science and Engineering, language: English, abstract: The work focuses on the analysis of the flow fields in the Food and Drug Administrations (FDA) 'Critical Path' benchmark blood pump. The CAD model of the pump is an opensource material, so the thesis works started with the mesh generation. A block-structured hexahedral mesh has been created using ANSYS ICEM CFD 15.0. An unsteady (URANS) incompressible blood flow simulation has been performed using k-? SST turbulence model, with one of the operating conditions prescribed by the experimental literature. The simulations were performed using ANSYS CFX 19.1 solver. The validated results for the flow field show promising results in the blade passage region and the dif
36.5 GBP
Recommendations
Choose your language and region
Klarna is available around the world with a variable offering, choose one that suits you best.
Copyright © 2005-2024 Klarna Bank AB (publ). Headquarters: Stockholm, Sweden. All rights reserved. Klarna Bank AB (publ). Sveavägen 46, 111 34 Stockholm. Organization number: 556737-0431