Alfano NTC Water Temperature Sensor For Alfano 6 / Pro Evo III / ADS Lap Timer - M10 x 1 Thread With 180cm Long Lead

Category

Hand tools

Store

Demon Tweeks

Brand

Alfano

A range of NTC type water or oil temperature sensors suitable for use with Alfano 6 1T, Alfano 6 2T, Pro Evo III and ADM lap timers. Ideal for karts with water cooled engines.Max temperature - 180 degrees C (356 degrees F)Optional extension lead available separately.

76.8 GBP